CLACKAMAS COUNTY MUST REJECT AI DATA CENTERS: PROTECTING OUR RESOURCES, RATES, AND FUTURE


Clackamas County stands at a decision piont. Although no AI data center proposals are currently on the table, we county residents must discuss how to proceed. Now is the moment to draw a firm line. While AI data centers promise economic growth and technological progress, the costs are far higher: massive strains on electricity and water systems, higher utility bills for residents, environmental harm, and limited local benefits. Clackamas County should prohibit these facilities. The long-term burdens on our communities, farms, and natural resources outweigh the benefits. AI data centers are unprecedented power consumers. Traditional data centers already use enormous amounts of electricity, but AI facilities amplify this demand dramatically. U.S. data centers consumed about 176 terawatt-hours (TWh) in 2023—roughly 4.4% of national electricity —with projections reaching 345–490 TWh or more by 2028–2030, largely driven by AI growth. A single hyperscale AI site can require as much power as 100,000 households. In Oregon, existing data centers have already contributed to rising electricity consumption and higher household bills.
For Clackamas County, the impact would be immediate. Utilities would need to expand capacity, often turning to fossil fuels or costly new infrastructure that would raise rates for everyone. Data centers frequently secure tax breaks and incentives, leaving residents and small businesses to fund grid upgrades. Studies in other states show these subsidies can deliver net losses, with returns as low as 50–70 cents per dollar of tax relief. While property taxes sound attractive, abatements and infrastructure demands tilt the balance toward corporations, not local families and small business.
Water use presents an even more pressing threat. AI data centers require vast quantities for server cooling. A large facility can consume 1–5 million gallons per day—equivalent to the water needs of a town of 10,000–50,000 people. Nationally, direct water consumption by data centers reaches hundreds of millions of gallons daily, with additional billions tied to electricity generation. In growing or water-stressed areas, this competes directly with agriculture, drinking water, ecosystems, and wildlife.
Rising water infrastructure costs are already exploding across the region. Clackamas County’s mix of urban, suburban, and rural landscapes, along with its sensitive watersheds, makes it particularly vulnerable. Heightened demand would likely increase water rates as utilities scramble for supplies and invest in treatment systems. During dry Pacific Northwest summers, shortages and restrictions could hit farms, firefighters, and residents hardest. Much of the water used in evaporative cooling is lost rather than returned to the system. As global AI usage surges, local facilities would intensify regional pressures. Oregon has already experienced these strains from data center growth—Clackamas should learn from its neighbors, like Washington County, instead of repeating their mistakes.
Economically, the case is weak. These centers generate construction jobs but few permanent high-wage positions, typically requiring only a small operations and maintenance staff. They occupy large industrial sites, create noise and traffic, and can lower nearby property values while affecting air quality. Land devoted to data centers is land removed from housing, light industry, or conservation. Tax incentives further diminish revenue potential, shifting costs onto homeowners.
Proponents highlight investment and modernity, yet the environmental costs—including significant carbon emissions depending on the energy source—undermine sustainability. AI growth is inevitable, but it need not come at the expense of Clackamas County’s livability. Such facilities belong in locations with abundant renewable power, excess water capacity, and grids designed for heavy loads.
Clackamas commissioners should update the Zoning and Comprehensive Plan, pass a temporary moratorium on data center development, amongst other steps, to prohibit AI data centers. Any future discussion must include comprehensive cost-benefit analyses, full tax contributions, water neutrality commitments, and meaningful community input.
The AI boom will continue, but Clackamas does not need to host its most resource-intensive infrastructure. By rejecting these data centers, we safeguard affordable utilities, reliable resources, and a balanced economy that puts residents first. Future generations will benefit from choosing stewardship over short-sighted development.